The New Standard in High-Tonnage Mold Handling
Improve uptime, reduce risk, and standardize every lift.

Up to 40% Faster Mold Changes

Eliminate high-risk manual handling steps

Protect million-dollar molds and equipment

Standardize Every Lift Across Your Operation
Replace Manual Rigging With a Controlled Mold Handling System
Traditional Mold Changes Often Require:
- Chains and slings
- Ladders and safety lines
- Manual balancing and alignment
- Multiple high-risk handling steps
Liftmold Simplifies the Process By:
- Aligning directly to dedicated mold lifting pins
- Securing automatically to the mold
- Enabling stable, controlled lifting and positioning
- Integrated safety sensors and optional mold locking technology help verify that molds are properly secured before transport begins.s
Faster
Safer
More repeatable
Less dependent on operator variability
Trusted by:
WHAT Manual Rigging is Costing You
You're Losing Over an Hour of Production Time Every Day
Typical operations lose ~66 minutes per day in mold change inefficiencies-adding up to 11 full production days per year.
One Failure Can Cost Tens of Thousands + and 72 Hours of Downtime
Most mold handling incidents are caused by fastening errors-leading to:
- Equipment damage
- Lost production
- Safety incidents
And 85% of these failures are preventable with the right system.
Your Mold Change Process Still Has 9 Built-In Risk Points
Climbing molds, attaching chains, and manual rigging introduce 9 separate high-risk steps-every single changeover.
You're Relying on Skill Instead of a System
Your process depends on experienced operators managing an "art form" which creates:
- Inconsistency
- Delays
- Increased risk under pressure
What you gain with LiftMould
Faster Changeovers. More Production Time.
Reduce mold change time by up to 40%
Eliminate Risk From Mold Handling
Remove all high-risk manual steps from the process
Standardize Every Mold Change
Turn a variable, skill-based process into a controlled system
How LiftMould Works

Step 1
Mount Liftmold to Your Existing Crane
Connect Liftmold to your existing overhead crane system

Step 2
Quickly Align to the Mold
Simple positioning of Liftmold to the mold lifting pins for fast, controlled alignment.

Step 3
Verified Lock. Controlled Lift.
Engage Liftmold’s electromechanical locking system for secure, verified mold handling.

Step 4
Lift and Position With Greater Control
Move and place large molds with improved stability, repeatability, and safety.
System Improvements: Over Manual Rigging
24.7 minutes → 13.7 minutes per mold change

40% reduction in changeover time

11 production days recovered annually

0 high-risk steps vs 9 in traditional methods
Stop relying on manual rigging and start running a faster, safer, and fully optimized mold change process


